A 4 × 3 m rectangular pour
- Input
- 4 m × 3 m × 100 mm; 10% wastage
- Result
- Wet concrete volume: 1.200000 m³; Wastage-adjusted wet volume: 1.320000 m³
The 0.1 m depth gives 1.2 m³ of wet volume. Adding 10% increases the estimate to 1.32 m³.
Calculate wet concrete volume for rectangular pours in cubic meters and cubic feet, with a separate wastage allowance and mixed-unit dimensions.
Results update as you edit. Use decimal points without commas. Costs use the same currency as your entered price.
Estimate updated. Wastage-adjusted wet volume (CFT): 46.615360 ft³.
Display values are rounded; calculations and costs use unrounded quantities. Tile and box counts always round up. A “<” result is positive but smaller than the displayed decimal precision.
Estimate the wet concrete volume for a rectangular pour from length, width and depth, then add a separate wastage allowance. Enter a shallow depth in millimeters or inches while using meters or feet for the plan dimensions; results are shown in both cubic meters and cubic feet.
Units are normalized before calculation: 1 in = 0.0254 m, 1 ft = 0.3048 m, 1 ft² = 0.09290304 m² and 1 ft³ = 0.028316846592 m³. Decimal arithmetic is retained through quantity rounding; dimensions and prices are limited to 1,000,000,000 per input.
The 0.1 m depth gives 1.2 m³ of wet volume. Adding 10% increases the estimate to 1.32 m³.
The base volume is 26⅔ ft³. A 5% allowance brings it to exactly 28 ft³, or 0.792871704576 m³.
The base and adjusted volumes both equal 0.45 m³ because no extra allowance is selected.
For standard slabs, footings, and pathways poured against smooth formwork, a 5% to 10% wastage allowance is customary. For uneven subgrades, deep trench excavations, or pump-line residue, contractors typically allow 10% to 15% extra.
Yes. Each dimension has an independent unit selector. You can enter length and width in meters or feet and depth in millimeters or inches. The calculator normalizes all units and displays the result in both cubic meters (m³) and cubic feet (ft³).
This calculates wet placed concrete volume. Ready-mix trucks are ordered directly by wet volume (m³ or cubic yards). If hand-mixing pre-blended dry concrete bags, note that dry ingredients compact by approximately 30–35% when water is added.
Calculate plywood face area, solid volume and optional sheet cost from length, width, thickness and quantity, using metric or imperial dimensions.
Construction CalculatorsCalculate rectangular timber volume per piece and in total, in cubic feet and cubic meters, with optional pricing per CFT.
Construction CalculatorsEstimate paint liters and cost from wall area, opening deductions, coats, adjustable product coverage and a wastage allowance.
Construction CalculatorsEstimate floor tiles, wastage-adjusted quantities, whole boxes and purchase cost with accurate upward rounding and metric or imperial dimensions.
Construction Calculators